Sig tms 3 3 30 4 battery unit unit.
Fire alarm battery load voltage test.
1 i don t have to test the batteries.
Common myths and misconceptions.
If the battery fails the load test a second time or bounces back to less than 75 percent state of charge then replace the battery because it lacks the necessary cca capacity.
Now as we stated above you need to place the multi meter test leads in series with the circuit being read.
See 3 3 38 3 unit multi cell.
Fire lite lite tips.
A controlled discharge of a battery at a specified rate for a given period of time until a final voltage is achieved in order to determine battery capacity.
Load voltage test semiannually verify the battery performs under load in accordance with the battery manufacturers specifications.
My questions for the sub are.
Load testing can be by any means of an artificial load equal to the full fire alarm load connected to the battery.
3 3 30 3 battery load test.
This pictures shows the fluke 117 multi meter with the positive test lead moved over to the amp port this is mandatory when checking a fire alarm circuit for current.
Debunking the myths common misconceptions about battery power supply testing.
How to check battery voltage duration.
Using a well designed accurate and reliable battery tester makes all the difference in knowing exactly how well the battery and your fire alarm system is working.
If the battery bounces back to less than 75 percent state of charge 1 225 specific gravity or 12 45 vdc then recharge the battery and load test again.
Sig tms 3 3 30 5 rechargeable battery.
The national fire alarm code recommends testing the battery s load voltage discharge and seal on semi annual and annual basis.
Nfpa 72 2013 edition section 7 2 1 where documentation is required by the enforcing authority the following list shall represent the minimum documentation required for all fire alarm and emergency communication systems including new systems and additions or alternations to existing systems within this list you will find 7 battery calculations and 8 voltage drop calculations.
Verify the voltage level does not fall below the levels specified.